At Cerezzola, the teams from VE.I.CO.PAL. were engaged in the construction of the foundations intended to host the inflatable mobile barrier, designed to restore the functionality of the historic weir on the Enza River. The Comacchio CH 650, a 70-ton multifunctional drilling rig, was at the center of the operations.
For more information